Projects

  • Operation and maintenance of Pilk Raibareily, Etawah, Mainpuri, Kannauj and Barabanki MSW Processing And Landfill facilities.
  • Development of processing and landfill facility for Pilkhuwa town situated in the NCR region of the country.
  • Development of Waste to Energy unit at Barabanki MSW facility.
  • Development of Bio-Methane plant at Barabanki for processing of Bio-Degradable fraction of MSW and make use of Bio-Gas as fuel for power generating unit.
  • The leachate generated in the dumps pollute the ground water as well as the near by surface sources.
  • Development of Steam Turbine based electricity generating unit using RDF as fuel. The boiler unit for generation of steam, steam turbine and the alternator have been procured and are under going changes required to suit the proposed fuel. The capacity of proposed plant is to generate 2.5 MW electricity.
  • Development of gasifier for generation of flu-gas using RDF as major fuel together with wood-chips or rice husk as secondary fuel. A small pilot unit has been developed and installed in the Barabanki processing plant. The test run was quite successful.
  • Similarly the dust generated in the dumps pollute the Air which can cause infection of lungs in the residents living nearby.
  • The central government and the government of Uttar Pradesh have recognized the menace of improper management of MSW and have initiated the CLEAN INDIA (GOI) and CLEAN UP GREEN UP (GOV-UP) MISSION.
  • Since we are already working in this field OUR aim is to be a part of this mission with whole hearted contribution to the best of OUR ability.
  • We take this opportunity to invite your prestigious organization to join hands and contribute to this noble cause.